Project: Geek   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Gary Phenning   -  
Project:   Kitfox - Series 7   -   VIEW REPORTS
Total Hours:1393.7
Total Flight Time:0.4
Start/Last Date:Mar 06, 2021 - Apr 06, 2024
Engine:Rotax 912is
Propeller:Whirlwind
Panel:Garmin G3x
 
Friendly URL: https://eaabuilderslog.org?s=Geek

Home or Last Project Picture

Apr 19, 2023     Cowling, Exhaust and Thermostat - (9 hours)       Category: Fuselage
Installed the Dzus fasteners between the upper and lower cowling as well as the ones between the upper and boot cowls. Due to the fit between the lower cowling, the boot cowling and the firewall foot wells, I needed to order some longer fasteners so am awaiting parts on that. I also cut the access hole for the exhaust pipe stinger and have the desired 1/2 inch clearance around it. Finished plumbing in the "Thermobob" thermostat into my cooling with a 180 degree thermostat installed. Should help get my engine temps up when warming up and keeping them stable when flying in colder weather;


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.